1. Excellent adhesion: the direct interface treatment material plays a linking role, which can make the base material tightly sealed, enhance the adhesion and allow other substances to cover it;
2. Super strong permeability: it can fully infiltrate the surface of the base material of the wall, improve the bonding strength between the subsequent material and the surface of the wall, and prevent hollowing;
3. Convenient construction, and labor and material saving;
4. Healthy and environment-friendly, and non-toxic and harmless.
1. It is suitable for treating the surface of materials with strong water absorption capability on the surface or smooth surface, which makes the interface difficult to bond: such as interface treatment before cement plastering and mortar repairing;
2. It is suitable for the base course that needs to be treated away from the opening: for example, the interface treatment of the base course before applying putty in batches or plastering on concrete, aerated concrete and brick-concrete-structured walls;
3. It is suitable for bonding wall coverings and wallpapers.
Step One: Base surface treatment
First remove the dust, oil stain and loose layer on the surface of the base course and ensure that the wall is clean and free of dust, grease and other substances that affect the bonding performance.
If there are peeling, pothole and cracking phenomena on the wall, ordinary cement mortar shall be used for repair first. If the base course of the wall has strong water absorption capacity, it can be wetted with clear water first.
Step Two: Mixing
It is recommended to use a hand-held electric device for mixing, so that the product can be mixed evenly before use.
Step Three: Application and drying
The product shall be applied to the base surface by roller, and shall be applied as a whole.
Step Four: Maintenance and finished product protection
Ventilation must be strengthened, and natural maintenance is enough. The subsequent process can be started only after the product is hard-dried and the base surface is completely sealed.
✔ The product is prohibited from being mixed with other adhesive products
✔ After opening the lid, please mix the product evenly before use
✔ During construction, the on-site air circulation shall be ensured and direct sunlight shall be avoided
✔ If the product accidentally comes into contact with eyes, rinse immediately with plenty of clear water and seek medical attention timely