Medium coarse putty (gray) for exterior walls
RETURN
The product is made of imported materials, high-quality cement and fine fillers. It has the characteristics of high strength and good flexibility, and can fully play the role of leveling and decoration of exterior walls.
  • Product parameter

    Product specification: 50kg/bag

    Executive standard: JG/T157-2009 Type P standard Putty for Exterior Wall

  • Construction process

     

     

     

     

     

    Step One:“Base course treatment”

    The base course shall be solid, clean and roughly flat; the PH value shall be less than 10, and the water content shall be less than 5%; if the base course has a high water absorption rate, it shall be wetted with clear water or treated with an interface agent in advance.

     

    Step Two:“Adding water and mixing”

    Pour water into the bucket (the mass ratio of putty to clear water is about 100:29~32), and add the powder material while mixing. The mixing time shall be 5-8 minutes, mixing shall be stopped for 2 minutes, and then the second mixing shall be carried out for 2 minutes before use.

     

    Step Three: “Applying the mixed adhesive

    The second layer shall be applied until the first layer is completely dry, and the time interval shall be ≥ 4h in summer and ≥ 24h in winter. (Actually, it varies due to the local climate and the coating thickness of putty during construction).

     

    Step Four:“Wall grinding”

    After the construction is completed, it can be carefully ground with sand paper or a wall grinding machine.

  • Notes

    ✔ The temperature on the construction site shall be between 5°C and 35°C. In the construction and drying process, it shall be ensured that the site should have good ventilation conditions and appropriate protective measures should be taken.

    ✔ Avoid applying it at the same time of applying the polyester paint.

    ✔ It is recommended that the fineness of sand paper should be between 150 and 200 meshes.

    ✔ The newly plastered cement wall shall be subject to construction after the curing period.

    ✔ Please keep children and pets out of the construction area and keep the product out of their reach.

    ✔ When grinding the wall, a mask shall be worn, and when using the oil paint, protective equipment such as protective glasses and masks shall be worn.

    ✔ If the product accidentally splashes into eyes, rinse immediately with plenty of water and seek medical attention immediately.

    ✔ Do not pour excess slurry into the sewer or drainage pipe.